Possible Concepts for Digital Twin Simulator for WWTP

Authors

  • Tiina Komulainen
  • Hilde Johansen

DOI:

https://doi.org/10.3384/ecp21185398

Keywords:

dynamic modeling, simulator, digital twin, water treatment, wastewater treatment plant

Abstract

Application of advanced modeling and simulation technologies is essential to meet future requirements for higher wastewater treatment capacity and increased discharge water quality without large investments in construction projects. This article describes an industrial pre-project for digital twin simulator for Veas wastewater treatment plant in Norway. The desired main functionalities of the digital twin simulator were:• Data- and model-based management as well as decision support for process operators• Predictive operational support and process optimization for engineers• Testing of process modifications, control system modifications, new procedures and other changes• Competency building and knowledge transfer between the operators and engineersCommercially available technologies were compared according to the functional design specification and four possible digital twin simulator concepts were developed for wastewater treatment facilities.

References

ABB. Process control and automation solutions for water and wastewater industry, 2021a. https://new.abb.com/control-systems/industry-specific-solutions/water-wastewater-treatment.

ABB. PUB, Singapore’s National Water Agency selects ABB to automate world’s largest membrane bioreactor, 2021b. https://new.abb.com/news/detail/70644/pub-singapores-national-water-agency-selects-abb-to-automate-worlds-largest-membrane-bioreactor.

ABB. ABB Ability™ System 800xA Simulator - realistic DCS simulation, 2021c. https://new.abb.com/control-systems/service/customer-support/800xA-services/800xA-training/800xa-simulator.

ABB. 800xA APC - Advanced Process Control, 2021d. https://new.abb.com/control-systems/system-800xa/800xa-dcs/embedded-systems/advanced-process-control.

Aquasight. Efficient Wastewater treatment and recovery, 2021. https://www.aquasight.io/apollo.html.

AspenTech. Aspen APM - Water & Wastewater, 2021.https://www.aspentech.com/en/industries/water-and-wastewater.

David B, Cameron, Arild Waaler, and Tiina M Komulainen. Oil and Gas digital twins after twenty years. How can they be made sustainable, maintainable and useful? The 59th Conference on Simulation and Modelling (SIMS 59). Oslo: Linköping University Electronic Press. 9-16, 2018. doi:10.3384/ecp181539.

Corys. Indiss Plus Dynamic simulation platform, 2015. https://www.corys.com/en/indiss-plusr.

Erik Dahlquist. FUDIPO - future directions of production planning and optimized energy and process industries, 2021. https://fudipo.eu/.

Erik Dahlquist, Eva Nordlander, Eva Thorin, Christian Wallin, and Anders Avelin. Control of waste water treatment combined with irrigation. 11th International Conference on Applied Energy, 2019. Västerås: Linköping University Electronic Press.

DHI. TwinPlant - Optimise the performance of yourtreatment plant on-line, 2021a. https://www.dhigroup.com/operational-services/twinplant.

DHI. WEST - WWTP modeling that does it all, 2021b.https://www.mikepoweredbydhi.com/products/west.

Hatch Hydromantis. Mantis.AI - A "Digital Twin" for your Treatment Facility, 2021a. https://www.hydromantis.com/MantisAI.html.

Hatch Hydromantis. GPS-X - Premium Water & Wastewater Modelling and Simulation Software, 2021b. https://www.hydromantis.com/GPSX.html.

Hilde Johansen. DTS VANN Digital tvillingsimulator for vannrenseanlegg. 04 09, 2021. https://veas.nu/forskning-utvikling/dts-vann.

Zoran Kapelan, Emma Weisbord, and Vladan Babovic. Artificial Intelligence for the water sector. London: International Water Association, 16, 2020. https://iwa-network.org/wp-content/uploads/2020/08/IWA_2020_Artificial_Intelligence_SCREEN.pdf.

Tiina M. Komulainen and Ronny Sannerud. Learning transfer through industrial simulator training: Petroleum industry case. Cogent Education (Cogent) 5 (1): 1-19, 2018. doi:10.1080/2331186X.2018.1554790.

Kongsberg. Online operator training simulator - improve operational efficiency, 2021a. https://www.kongsberg.com/digital/products/process-simulation/online-operator-training-simulator/.

Kongsberg. Production monitoring system – Full picture production and look-ahead calculations, 2021b. https://www.kongsberg.com/digital/products/process-simulation/production-monitoring-system/.

Kongsberg. K-Spice process simulation, 2021c. https://www.kongsberg.com/digital/products/process-simulation/.

Krüger Kaldnes Veolia. Hubgrade, Veolia’s smart monitoring solution, 2021. https://www.veolia.com/en/solution/smart-services-smart-monitoring-solutions.

Hanna Molin. Implementation of digital twins at water resource recovery facilities. Industrial Electrical Engineering and Automation , Lund University, Lund:Lund University, 21, 2021. Accessed 2021. https://www.iea.lth.se/publications/Reports/LTH-IEA-7276.pdf.

TIBCO. TIBCO makes it possible to unlock the potential of your real-time data for making faster, smarter decisions, 2021. https://www.tibco.com/.

Borja Valverde-Pérez, Bruce Johnson, Christoffer Wärff, Douglas Lumley, Elena Torfs, Ingmar Nopens, and Lloyd Townley. Digital Water - Operational digital twins in the urban water sector: case studies. London: IWA - international water association, 17, 2021. https://iwa-network.org/wp-content/uploads/2021/03/Digital-Twins.pdf.

Milan Zlatkovikj, Valentina Zaccaria, Ioanna Aslanidou, and Konstantinos G Kyprianidis. Simulation study for comparison of control structures for BFB biomass boiler. 61st SIMS Conference on Simulation and Modelling. Virtual: Linköping University Electronic Press, pages 107-115, 2020. doi:10.3384/ecp20176107

Downloads

Published

2022-03-31